Skip to content
Modern white house with wood-clad panels and glass balconies behind a trimmed hedge above a quiet street
Central Austin · Rosedale

Home Remodeling in Rosedale, Austin, Texas

Cottages from the 1930s and 40s on some of central Austin's most walkable streets. Small originals, bigger plans, and the design work that connects them.

5.0based on 31 reviews
63Austin Projects
1 in 2Clients From Referrals
3%Surprise Change Orders
2–4Weeks to Full Design
Remodeling in Rosedale

Small cottages with bigger plans

Rosedale sits between 35th and 45th, Lamar and Burnet: 1930s and 40s cottages and minimal traditional homes around Ramsey Park, a short walk from Central Market and the Triangle. The originals run 1,100 to 1,600 square feet on lots that can hold more, which is why the defining Rosedale project is the remodel-plus-addition. Growing a small original well, without losing what made it worth keeping, is design work before it is construction work.

Small footprints, good bones

The originals are simple, well proportioned, and worth building on. Most projects keep the face of the house and grow the back.

The addition conversation

Kitchens open up, primary suites get added, and the house often near doubles. How the new meets the old decides whether it works.

Pier-and-beam first

Original foundations get evaluated and leveled as part of design, so the addition lands on numbers, not assumptions.

Old Meets New

The Rosedale addition question

Adding to a 1940s cottage is three specific problems: a foundation that ties in level, rooflines that meet cleanly, and a city cap on floor area that sets the envelope early. We settle all three in the design phase, so the addition you approve is one the lot allows, the structure supports, and the street will never question.

What is thereThe original, 1941
What is comingThe addition, now
New addition foundation meeting the original structure
Foundation seam
New footings tie into the original pier-and-beam, leveled so nothing telegraphs through the floor.
Roofline junction
Eaves and pitches resolved in massing studies until the meeting line looks inevitable.
Floor-area envelope
The city’s cap on what the lot can carry, mapped before the first sketch.
Our Services

What we build in Rosedale

Most Rosedale projects pair a full remodel of the original with new square footage behind it. We design both as one house, one price, one schedule.

How We Build

Better materials, by default

Where new construction meets an 80 year old structure, the joints matter: moisture, air sealing, and insulation strategy across old and new are settled in design, not improvised in framing.

Our Design Process
Renderings, selections, and a fixed price in 2–4 weeks.
Mold-Resistant Construction
Built for Austin's humid climate.
Non-Toxic Materials
Chosen for the air you breathe.
Our Process

The same process, everywhere we build

  1. 1

    Design before demo

    Layout, selections, engineering, and price are settled in the design phase. Construction starts with nothing left to decide.

  2. 2

    A schedule you approve

    You approve the full construction schedule before demo day, and every daily report measures against it.

  3. 3

    Daily logs in your portal

    Photos and a written update every working day, from wherever you are.

Every Project, Every Time

The Enso Standard

Six things we do on every project

1.Priced From Data, Not Instinct

National cost data, tuned for Central Texas, spelled out line by line, with our profit shown right on the estimate. The price is what the data says, not what we think you'll pay.

2.A Schedule You Approve Before Demo

Every phase, trade, and milestone in a Gantt chart, signed off by you before demo begins. Contractors who run late don't put schedules in writing. We do.

3.Selections Settled in Design

Every material, fixture, and finish is chosen during design, when there's time to think. Construction starts with a complete plan, not a running list of open decisions.

4.A Job Site That Respects Your Home

A sealed dust barrier goes up between the work zone and the rest of your home, with HEPA filtration running from day one. Designated disposal bins, no food on site, no trash left behind.

5.Daily Logs in Your Client Portal

Photos and a written update every working day, plus a weekly walkthrough with your project lead (in person or on video). You never chase us for an update.

6.The Final 10% Waits for You

We don't bill the final payment until the punch list is complete and you've signed off. Three months later, we're back to make sure everything works the way it should. All of it carries a one-year craftsmanship warranty.

Where We Work

The neighborhoods and towns we know well

When You're Ready

A conversation about your project, timeline, and budget. You'll leave with real next steps, whether or not we build together.